Sunday, 28 April 2013

Control Phase

Control Phase Activities:

Having completed the Define, Measure, Analyze and Improve phases of the A3 the proposed solutions must now be monitored for effectiveness to confirm that the proposed solutions addressed the root cause of the Rework problem and are maintained.

As part of the close out actions of the ‘Improve Phase’ an action plan was established to monitor the implementation of the proposed solutions to the Rework problem.

The simple ‘Action Plan’ tool consisted of the following:

Improvement
Who
What
By When
Improvement 1

EOC
Guidance document update
April 2013
Improvement 2
Cross functional team
Provide cross- functional refresher training
April 2013
Improvement 3
Analysts of the System
Electronic System Updates
June 2013


Monitoring of Improvements:

(1)   Visual Management System – continue to monitor WIP
(2)   Metrics on Rework – 3 month analysis of data post completion of solutions 1 and 2
(3)   At close of 3 month review period, calculations to be completed to confirm that A3 goal of a reduction of 25% in Change Request reworks is achieved.
(4)   In addition, 3 months subsequent to Electronic System Updates, calculations to be repeated to confirm that A3 goal of a reduction of 25% in Change Request rework is achieved.

Improve Phase

Improve Phase Activities:

The outcome of the Analyse Phase determined the activities to be completed in the IMPROVE phase. The areas that were considered as the key areas which would reduce rework in the Change Request process included the following:

(1)   SYSTEM: Update the electronic system used to process change requests to add further ‘prompts’ in the system which would mandate certain information to be added by the originator of the change.

(2)   PROCEDURES: Multiple procedures are in place to outline the requirements regarding change requests. Additional guidance also in place. Mandate the use of the guidance document. Also update of the guidance document to divide into critical sections, rather than current detail which combines all requirements in one place.

(3)   TRAINING: Cross functional training to re-emphasize the required content for Change Requests.


The following DMAIC Tools were used during the IMPROVE phase:
(1)   Prioritization Matrix:
Many forms of this tool are widely available using weighted and unweighted scoring of potential solutions.  See below a customized prioritization matrix which considers business needs in relation to each proposed solution as outlined below:
 

  


(2)   Brainstorming: Brainstorming was completed by the project team members classify each of the proposed solutions into a defined category for presentation to the Project Champion and Management to determine the resources (personnel and financial) support available to implement the proposed solutions.

(3)   Who/What/When: For each of the proposed solutions, the project team assigned an owner of the task, an outline of what activity was to be completed and a completion date.

Analyze Phase

 
Analyze Phase Activities:
From the Measure Phase, the Key X’s were selected based on the use of the 5 Whys
tool.

The 5 Why’s tool allowed the team to work through the primary reasons for rework and
allowed the team to determine the root causes of each. Refer to the weblink for an
example of the template used during this process.

An extract of the Template is provided below:

5 Why’s Template:
Define the Problem:
Why is that?
1.
            Why is that?
            2.
                                Why is that?
                                3.
                                                     Why is that?
                                                     4.
                                                                          Why is that?
                                                                          5.
The 5 Why’s highlighted multiple root causes which contribute to the ‘rework’ during
the process. Therefore, further analysis of the 5 Why’s process was required to select
the primary root causes.
 
Further analysis was completed through brainstorming all root causes and selecting the
primary root causes through team process experience and a multivoting process by the
team.

Cause and Effect Analysis was also completed on the Key X’s to determine the impact of
each of the root causes.

Summary of Analysis:
The Analysis concluded that a number of factors where contributing to the ‘rework’. These
included the following:
(1) Different expectations and needs across functions reviewing changes e.g. experts in the
change finding very technical detail acceptable, while other functions who are not
experts in the process require less technical detail.
(2) The system by which the changes are processed encourages a ‘collaboration’ approach
to reviewing changes rather than ‘first time quality’ by the personnel initiating the
change request.
(3) Further training re products/processes by the department would reduce rework
regarding ‘clarification’ of change and change detail.